BUILT FOR PHILIPPINE MANUFACTURING & FACTORIES

Unify Your Bill of Materials, Shop Floor Operations, and Factory Accounting in One OS

See material shortages before you release a job. Reserve and issue BOM components, record variance and scrap, and keep factory books on Philippine BIR CAS-ready accounting — on the same tenant.

The factory workspace for BOM, work orders, QC, and material cost — not another disconnected spreadsheet.

14-day free trial. No credit card required.

Manufacturing command center · Work order & BOM

Demo data
Open work orders
12
Material reserved
5
QC pending
3
Shortages
2

Bill of materials

Instant Coffee 250g BOM-CF250-R3 · Rev C · Approved ₱42.80 / unit

  • RM-BEAN Roasted coffee beans 255 g · OH 180 kg Available
  • PKG-FILM Packaging film (child BOM) 1 pc · OH 420 pc Available
  • PKG-LID Foil lid 1 pc · OH 40 pc Shortage

Work order board

  • WO-1042 Instant Coffee 250g · 2,000 pcs Line 2 In progress
  • WO-1043 Instant Coffee 250g · 1,500 pcs Line 1 Material reserved
  • WO-1044 Tea Mix 100g · 800 pcs Line 3 QC pending

Sample factory figures for demonstration. Not a customer result.

Built for food processing, electronics, garments, and industrial factories across the Philippines.

  • Food processing
  • Electronics
  • Garments
  • Industrial
  • BIR CAS-Ready books
  • ISO-style QC records

Industry chips describe who the workspace is for. They are not customer logos or ISO/BIR certificates.

Problem vs solution

Factories lose margin when BOM, the floor, and the books live in different files.

Excel BOMs drift from inventory. Shop-floor cost is guessed after the batch ships. Accounting closes without the work-order trail.

Problem

Excel-based BOM causing inventory discrepancies and unexpected material shortages.

NexoBiz solution

Multi-level BOM with child-component roll-up, waste %, and live on-hand vs required before you reserve or release.

Problem

Blind shop-floor costs leading to inaccurate product pricing and profit loss.

NexoBiz solution

Work-order estimate from the approved BOM, then planned vs actual material cost, scrap, and variance on the same job.

Costing here is material planned vs actual — not a live selling-price margin engine, and not automatic labor or overhead allocation.

Factory flow

From approved BOM to closed job — one connected manufacturing OS.

Staff create the work order, reserve and issue materials, release to the floor, inspect, then close. Nothing invents itself.

  1. BOM Draft → approve → release
  2. Work order Link BOM snapshot
  3. Reserve On-hand vs required
  4. Issue Staff material issue
  5. Release To production floor
  6. In progress Line + operator
  7. QC Pass / fail / rework
  8. Close Variance + scrap

Factory workspace

The manufacturing screens your team will actually open.

Four connected surfaces — not a brochure of modules you cannot run.

Approve the structure. Then run the job from that snapshot.

Multi-level BOMs nest manufactured components, block circular references, and roll up standard material cost. A work order freezes the approved snapshot, then staff reserve and issue lines. Issue is a warehouse action — not an automatic requisition robot.

  • Revisions: draft, pending approval, approved, released, obsolete
  • Child BOM roll-up with cycle guard
  • On-hand vs required before reserve
  • Staff reserve → staff issue → release → start
Sample Dynamic BOM & Work Orders
SKU Component Required On hand Availability
RM-BEAN Roasted coffee beans 510 kg 180 kg Shortage
PKG-FILM Packaging film 2,000 pc 2,400 pc Available
PKG-LID Foil lid 2,000 pc 40 pc Shortage

Availability reads inventory on-hand. Reserve and issue write work-order reservation records. This release does not auto-decrement inventory or auto-create purchase requisitions.

What the workspace measures

Outcomes you can run — not invented savings percentages.

We do not publish “30% less waste” or “3× faster dispatch” as customer results. These are the controls the factory workspace actually gives you.

  • On-hand vs required Shortage visible before you reserve or release a work order.
  • Planned vs actual Material cost variance and scrap on every closed job.
  • QC on the same WO Pass, fail, or rework without a second spreadsheet.

Before / after

Stop running the factory from Excel and group chats.

Before NexoBiz

  • BOM in a shared workbook
  • Inventory guessed at issuance
  • Work orders on paper or chat
  • QC results in a separate file
  • Cost known after the month closes
  • Accounting disconnected from the job

After NexoBiz

  • Approved multi-level BOM with revisions
  • On-hand vs required on the work order
  • Status board from draft to closed
  • QC inspection on the same record
  • Material estimate vs actual variance
  • BIR CAS-ready books on the same tenant

Trust

Proof you can verify later.

We do not publish invented factory counts, waste-reduction percentages, or client logos.

Add verified customer story here.

FAQ

Straight answers for factory owners.

Does NexoBiz support multi-level BOMs?

Yes. Manufactured components can link a child BOM. Cost roll-up is recursive, circular references are blocked, and nesting has a supported depth limit.

Does NexoBiz automatically issue material requisitions?

No. Staff reserve materials from the BOM, then staff issue reserved lines. The workspace does not auto-create purchase requisitions or auto-decrement inventory in this release.

Can I track batch or lot numbers?

You can store an optional batch/lot note on BOM and reservation lines, and flag inventory items as batch-tracked or serial-tracked. This is not a full expiry / FEFO / genealogy engine.

Does NexoBiz schedule machines and measure operator efficiency?

No. Work orders have due dates, a production-line label, and an assigned operator name. There is no machine calendar, OEE, or live efficiency feed.

Does NexoBiz calculate exact product margins in real time?

No. You get BOM standard material cost and planned vs actual material variance on the work order. That is not a live selling-price margin or overhead absorption engine.

Does NexoBiz generate automatic P&L per product line?

No. Manufacturing does not auto-build product-line P&L from the shop floor. Quotation P&L templates exist for bids. Financial statements live in the Accounting module after human journal approval.

Is NexoBiz BIR-approved for factories?

The Accounting module is BIR CAS-ready (Philippine chart, journal approval, VAT/EWT, books, and working papers). CAS-ready is not BIR approval. The taxpayer still registers and files with the BIR/RDO.

Can multiple factory roles use one workspace?

Yes. Permissions cover BOM approval, work-order create/manage, warehouse reserve/issue, QC, operator progress, and cost-variance visibility.

Ready to Modernize Your Factory Operations?

Set up your manufacturing workspace in minutes. No credit card required.

14 days free • Instant setup • Cancel anytime

14-day free trial. Book a factory demo if you want a walkthrough with your BOM and work orders.

NEXOBIZ.cloud

We're here to help. Start a conversation with our support team.