Problem
Excel-based BOM causing inventory discrepancies and unexpected material shortages.
NexoBiz solution
Multi-level BOM with child-component roll-up, waste %, and live on-hand vs required before you reserve or release.
BUILT FOR PHILIPPINE MANUFACTURING & FACTORIES
See material shortages before you release a job. Reserve and issue BOM components, record variance and scrap, and keep factory books on Philippine BIR CAS-ready accounting — on the same tenant.
The factory workspace for BOM, work orders, QC, and material cost — not another disconnected spreadsheet.
14-day free trial. No credit card required.
Manufacturing command center · Work order & BOM
Demo dataInstant Coffee 250g BOM-CF250-R3 · Rev C · Approved ₱42.80 / unit
Sample factory figures for demonstration. Not a customer result.
Built for food processing, electronics, garments, and industrial factories across the Philippines.
Industry chips describe who the workspace is for. They are not customer logos or ISO/BIR certificates.
Problem vs solution
Excel BOMs drift from inventory. Shop-floor cost is guessed after the batch ships. Accounting closes without the work-order trail.
Problem
Excel-based BOM causing inventory discrepancies and unexpected material shortages.
NexoBiz solution
Multi-level BOM with child-component roll-up, waste %, and live on-hand vs required before you reserve or release.
Problem
Blind shop-floor costs leading to inaccurate product pricing and profit loss.
NexoBiz solution
Work-order estimate from the approved BOM, then planned vs actual material cost, scrap, and variance on the same job.
Costing here is material planned vs actual — not a live selling-price margin engine, and not automatic labor or overhead allocation.
Factory flow
Staff create the work order, reserve and issue materials, release to the floor, inspect, then close. Nothing invents itself.
Factory workspace
Four connected surfaces — not a brochure of modules you cannot run.
Multi-level BOMs nest manufactured components, block circular references, and roll up standard material cost. A work order freezes the approved snapshot, then staff reserve and issue lines. Issue is a warehouse action — not an automatic requisition robot.
| SKU | Component | Required | On hand | Availability |
|---|---|---|---|---|
| RM-BEAN | Roasted coffee beans | 510 kg | 180 kg | Shortage |
| PKG-FILM | Packaging film | 2,000 pc | 2,400 pc | Available |
| PKG-LID | Foil lid | 2,000 pc | 40 pc | Shortage |
Availability reads inventory on-hand. Reserve and issue write work-order reservation records. This release does not auto-decrement inventory or auto-create purchase requisitions.
Send a job to QC, record pass, fail, or rework, and keep defect category plus inspector notes. BOM and reservation lines can carry an optional batch/lot note. Inventory items can be flagged batch-tracked or serial-tracked.
| Work order | Inspection | Batch / lot note | QC result | Inspector |
|---|---|---|---|---|
| WO-1044 | QC-0188 | LOT-2509-A | Pending | — |
| WO-1039 | QC-0184 | LOT-2508-C | Passed | Dela Cruz |
| WO-1036 | QC-0181 | LOT-2508-B | Rework | Santos |
This is not a complete lot-expiry genealogy or FEFO engine. Expiry dates are not a manufacturing scheduler in this release.
The production board uses the live work-order statuses. Assign a production line and operator name, set due and start dates, then move the job: draft, planned, material reserved, released, in progress, QC pending, rework, completed, closed.
| Work order | Product | Qty | Line | Operator | Due | Status |
|---|---|---|---|---|---|---|
| WO-1042 | Instant Coffee 250g | 2,000 | Line 2 | Reyes | Sep 5 | In progress |
| WO-1043 | Instant Coffee 250g | 1,500 | Line 1 | Cruz | Sep 6 | Material reserved |
| WO-1044 | Tea Mix 100g | 800 | Line 3 | Lim | Sep 4 | QC pending |
This is not machine calendaring, OEE, or real-time operator efficiency. Line and operator are workspace labels, not a MES feed.
Each work order carries an estimated material cost from the BOM and an actual cost from recorded usage variance. Accounting on the same tenant is Philippine BIR CAS-ready — chart, journals, VAT/EWT, and working papers. CAS-ready is not BIR approval.
| Work order | BOM estimate | Actual materials | Variance | Scrap |
|---|---|---|---|---|
| WO-1039 | ₱85,600 | ₱88,140 | +3.0% | 12 kg |
| WO-1033 | ₱41,200 | ₱39,870 | −3.2% | 4 kg |
| WO-1028 | ₱62,400 | ₱62,400 | 0.0% | 0 |
Not automatic P&L generation per product line, not a live selling-price margin ticker, and not auto-posted manufacturing journals. Quotation P&L templates exist separately for bids.
What the workspace measures
We do not publish “30% less waste” or “3× faster dispatch” as customer results. These are the controls the factory workspace actually gives you.
Before / after
Trust
We do not publish invented factory counts, waste-reduction percentages, or client logos.
Add verified customer story here.
FAQ
Yes. Manufactured components can link a child BOM. Cost roll-up is recursive, circular references are blocked, and nesting has a supported depth limit.
No. Staff reserve materials from the BOM, then staff issue reserved lines. The workspace does not auto-create purchase requisitions or auto-decrement inventory in this release.
You can store an optional batch/lot note on BOM and reservation lines, and flag inventory items as batch-tracked or serial-tracked. This is not a full expiry / FEFO / genealogy engine.
No. Work orders have due dates, a production-line label, and an assigned operator name. There is no machine calendar, OEE, or live efficiency feed.
No. You get BOM standard material cost and planned vs actual material variance on the work order. That is not a live selling-price margin or overhead absorption engine.
No. Manufacturing does not auto-build product-line P&L from the shop floor. Quotation P&L templates exist for bids. Financial statements live in the Accounting module after human journal approval.
The Accounting module is BIR CAS-ready (Philippine chart, journal approval, VAT/EWT, books, and working papers). CAS-ready is not BIR approval. The taxpayer still registers and files with the BIR/RDO.
Yes. Permissions cover BOM approval, work-order create/manage, warehouse reserve/issue, QC, operator progress, and cost-variance visibility.
Set up your manufacturing workspace in minutes. No credit card required.
14 days free • Instant setup • Cancel anytime
14-day free trial. Book a factory demo if you want a walkthrough with your BOM and work orders.